Single-station version |

Operation
- 1 employee for putting on, clippsing
and taking out
Transport
- with transport back to the operator
at the clips place
Tact: 1,5 – 2* min
- plus manual activities at the clips
place: for example putting on,
clippsing the fittings, taking out
Pass-through maschine |

Operation
- 1 employee for putting on + clippsing
Transport
- with flow to the post-stored setting-up,
for example unstacking into compartments
Tact: 1,5 – 2* min
- plus manual activities at the clips place:
for example putting on, clippsing the fittings
- manual activities will be effected parallel
to the processing on the machine
Note:
The data for the machining time is based on:
* 1 standard sash measuring 1 m x 1.2 m - turn and tilt